In Hennepin County, MN, building permit fees Calculator are based on total project valuation, including labor and materials, following Minnesota Rule 1302.0600 and Statute 326B. Valuation-Based total project cost sets the fee. Components building permit, plan review, and state surcharge. Permit Types new construction, mechanical, plumbing, detached garages. Penalties work without a permit adds investigation fees Calculation Tool DLI online calculator ensures accurate estimates.
Permit, Plan Review & Surcharge Calculator
How to Use the Hennepin County Building Permit Fee Calculator
Enter your total construction value (labor + materials) without symbols, click “Calculate,” and instantly view building permit, plan review, and surcharge fees based on official Minnesota formulas.
What You Get from the Calculator & Why It Matters
This calculator provides ,Full Plan Review Fee, 75% Review Fee, Building Permit Fee, State Surcharge, and Total Cost. It follows Minnesota Rule 1302.0600 and Statutes 326B.153 and 326B.148. Using it helps property owners, contractors, and developers accurately estimate compliance costs before submitting plans or applying for permits.

Hennepin County Building Permit Fee Valuation Brackets (2026)
Building permit fees in Hennepin County are calculated using progressive valuation brackets under Minnesota Rule 1302.0600. As construction value increases, the fee adjusts according to state-approved formulas.
Building Permit Fee Brackets
| Construction Value Range | Fee Calculation Method |
|---|---|
| $1 – $500 | Flat base fee |
| $501 – $2,000 | Base fee + incremental rate per $100 |
| $2,001 – $25,000 | Base fee + rate per $1,000 |
| $25,001 – $50,000 | Tiered rate per $1,000 |
| $50,001 – $100,000 | Reduced incremental rate per $1,000 |
| $100,001 – $500,000 | Lower rate per $1,000 applied progressively |
| $500,001 – $1,000,000 | Adjusted rate per $1,000 |
| Over $1,000,000 | Progressive rate continues at state formula |
State Surcharge Brackets
The surcharge is calculated separately using valuation thresholds defined under Minnesota Statute 326B.148, applying percentage-based reductions as project value increases.
Conclusion
Building permit fees in Hennepin County are determined through valuation-based formulas under Minnesota Rule 1302.0600 and applicable state statutes. By using the calculator, property owners and contractors can accurately estimate building permit, plan review, and surcharge costs. This ensures proper budgeting, full code compliance, and protection from investigation penalties before beginning any residential, commercial, or public construction project.
FAQs
How Does the MN Building Permit Calculator Work?
The Minnesota Department of Labor and Industry building permit calculator estimates fees based on total construction valuation. By entering labor and material costs, users can instantly calculate building permit, plan review, and state surcharge fees under Minnesota Rule 1302.0600.
Where Can I Find the Minneapolis Permit Fee Schedule?
The Minneapolis permit fee schedule is published by the City of Minneapolis and outlines valuation-based permit costs for residential and commercial projects. Fees vary depending on construction type, scope of work, and applicable inspection requirements.
What Is Included in a Building Permit Fee Schedule?
A building permit fee schedule typically includes the base permit fee, plan review fee, and state surcharge. In Minnesota, these fees follow statutory formulas tied to total project valuation and apply to structural, mechanical, plumbing, and renovation work.
How Much Are MN Electrical Permit Fees?
Minnesota electrical permit fees depend on project size and electrical system scope. The Minnesota Department of Labor and Industry sets standardized fee structures, which may include inspection charges and valuation-based adjustments for residential or commercial installations.
What Are Minneapolis Plumbing Permit Fees?
Plumbing permit fees in Minneapolis are calculated based on fixture count, project valuation, and inspection requirements. The City of Minneapolis provides detailed fee schedules covering new installations, remodels, and system replacements.
How Do Hennepin County Building Permits Work?
Building permits in Hennepin County are required for most structural, mechanical, and plumbing projects. Fees are valuation-based and must comply with Minnesota building codes before construction begins to avoid penalties or investigation fees.
What Is the MN DLI Fee Calculator?
The MN DLI fee calculator is an online tool that computes building permit, plan review, and surcharge fees using statutory formulas. It ensures accurate cost estimates for public buildings, licensed facilities, and qualifying construction projects statewide.
What Requires a Building Permit in MN?
In Minnesota, a building permit is required for new construction, structural alterations, additions, major repairs, plumbing, mechanical, and electrical work. Minor cosmetic updates may not require permits, but structural or safety-related changes typically do under state building codes.



